Preoperative/procedure testing for surgical, cardiac catheterization and scheduled C-section pati...

March 25th, 2013
Download

Emergency department overcrowding has created patient throughput challenges with 2012 volume alre...

March 25th, 2013
Download

Good Samaritan Regional Health Center’s medical unit required four hours, 18 minutes to discharge...

March 6th, 2013
Download

An opportunity was identified to improve the care of the ventilated patient through education and...

March 6th, 2013
Download

Since 1999, anticoagulant therapy was one of the top three causes of adverse events. A Six Sigma ...

June 1st, 2012
Download

A Lean project to address why physicians were not receiving lab results in a timely manner was im...

June 1st, 2012
Download

This Lean project focused on improving processes in central sterile processing. All processes for...

June 1st, 2012
Download