An ED case management program was developed to implement tactics focused on reducing ED avoidable...

March 27th, 2013
Download

Emergency department overcrowding has created patient throughput challenges with 2012 volume alre...

March 25th, 2013
Download

Preoperative/procedure testing for surgical, cardiac catheterization and scheduled C-section pati...

March 25th, 2013
Download

After acknowledging that medication errors were on the rise, the facility implemented computerize...

March 12th, 2013
Download

Utilizing PDSA, the hospital’s multidisciplinary team utilized evidence based best practices to e...

March 12th, 2013
Download

Following a high rate of central line-associated blood stream infections in the fourth quarter of...

March 6th, 2013
Download

Good Samaritan Regional Health Center’s medical unit required four hours, 18 minutes to discharge...

March 6th, 2013
Download

An opportunity was identified to improve the care of the ventilated patient through education and...

March 6th, 2013
Download

After experiencing an increase in CLABSI, the vascular access team and infection prevention and c...

June 1st, 2012
Download

A quality improvement project using Lean Six Sigma DMAIC method in a 500-bed tertiary medical cen...

June 1st, 2012
Download

Excess days were identified as an area for improvement due to the disparity between hospitals wit...

June 1st, 2012
Download

A Lean project to address why physicians were not receiving lab results in a timely manner was im...

June 1st, 2012
Download

This Lean project focused on improving processes in central sterile processing. All processes for...

June 1st, 2012
Download

Since 1999, anticoagulant therapy was one of the top three causes of adverse events. A Six Sigma ...

June 1st, 2012
Download

Customer satisfaction performance is a hospital strategic goal. Marianjoy's inpatient satisfactio...

June 1st, 2012
Download

The quality assurance department developed a system for tracking quality indicators in every depa...

June 1st, 2012
Download

A pressure ulcer team was developed and Plan-Do-Study-Act practice was used to focus on process c...

June 1st, 2012
Download